University Park Water Reclamation Facility (WRF) Upgrades, Stages 3, 4, 5

Project Number: 
00-05991.00
Project Description: 

The project consists of the 2 new buildings PTF and MBR and the Selective Demo and Renovation of the existing Administration Building. Architectural & Mechanical elements at the PTF and MBR include misc. metals, masonry, doors, windows, roofing, HVAC, plumbing and room finishes.

PSU Project Leader: 
Bid Date and Time: 
Thursday, February 27, 2020 - 3:00pm
Prequalification: 

All bidders must be prequalified by Haskell.  Use the hyperlink below to access the Prequalification forms and the Bid Advertisement.

https://app.buildingconnected.com/public/555110fac609c70700ea6fed/projects/5c87ffa29b58d2002a1fff17

Additional Information: 

Currently bidding building finishes only. Remainder work for future bids include landscape, paving, and fencing.

 

Professional Consultant
Company Name: 
Hazen and Sawyer
Contact Name: 
Tony Greiner
Address: 

9101 Southern Pine Blvd, Suite 250, Charlotte, NC, 28273

Phone: 
(704) 357-3150
CM Firm
Company Name: 
Haskell
Contact Name: 
Jeremy Holsinger
Address: 

111 Riverside Ave, Jacksonville, FL 32202

Phone: 
(904) 357-4924
Previous Bid Packages
Package Number Title Anticipated Document Delivery Pre-Bid Date/Time Pre-Bid Meeting Bid Date/Time Awarded To Document
08.1 Overhead Coiling Doors 02/06/2020 No pre-bid 02/27/2020 3:00 PM Central PA Dock and Door
9.1, 10, 12 Finishes, Casework, Specialties 10/10/2019 No pre-bid 10/30/2019 3:00 PM Penn Installation
1.01 Design-Assist Mechanical/Plumbing No pre-bid 10/24/2019 3:00 PM Hazen and Sawyer
15.1 Plumbing No pre-bid 06/27/2019 3:00 PM Myco Mechanical
15.2 HVAC 05/30/2019 No pre-bid 06/27/2019 3:00 PM Myco Mechanical
15.3 Fire Protection 05/30/2019 No pre-bid 06/27/2019 3:00 PM Clemmer Fire Protection
4.0 Masonry 05/30/2019 No pre-bid 06/27/2019 3:00 PM Harris Masonry
7.0 Metal Roofing/Wall Panels 05/30/2019 No pre-bid 06/27/2019 3:00 PM RH Marcon
8.0 Doors/Windows 05/30/2019 No pre-bid 06/27/2019 3:00 PM HC HoodCo
10.00 Specialties 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM
14.0 Cranes and Hoists 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM
15.0 Process Piping and Equipment Installation 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM G.M. McCrossin
15.1 Plumbing 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM Myco Mechanical
15.2 HVAC 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM Myco Mechanical
15.3 Fire Protection 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM Clemmer Fire Protection
16.0 Electrical 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM
17.0 Instrumentation & Controls 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM
2.3 Landscaping & Grasses 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM
2.4 Fencing 10/18/2018 11/08/2018 10:00 PM Voluntary 11/20/2018 3:00 PM
2.5 Site Utilities 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM G.M. McCrossin
2.6 Earthwork 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM G.M. McCrossin
2.7 Paving 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM
3.0 Concrete 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM G.M. McCrossin
3.4 Post Tension Concrete Tanks (Alternate Bid) 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM
4.0 Masonry 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM
5.0 Structural Steel and Miscellaneous Metals 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM G.M. McCrossin
7.0 Roofing 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM
8.0 Doors and Windows 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM
8.1 Overhead Coiling Doors 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM Central PA Dock and Door
8.2 General Trades - Administration Building COMPLETE 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM
9.0 Painting & Coatings 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM
9.1 Building Finishes (PTF & MBR) 10/18/2018 11/08/2018 10:00 AM Voluntary 11/20/2018 3:00 PM
1 Stages 1 & 2 Sitework 09/12/2018 09/09/2018 10:00 AM 10/04/2018 3:00 PM G.M. McCrossin
2 Stages 1& 2 Electrical 09/12/2018 09/19/2018 10:00 AM 10/04/2018 3:00 PM Bob Biter Electric