East Halls 1C, 100% CD Package

Project Number: 
00-05289.00
Project Stage: 
Out to Bid
Project Description: 

Renovations of three (3) buildings: each 74,719 SF 10-story residence hall (plus basement) (Brumbaugh Hall, Tener Hall, and Pinchot Halls) and project site work associated with Phase 1C.

Document Distribution detail is on listed on each Bid Package.

PSU Project Leader: 
Bid Date and Time: 
Tuesday, January 15, 2019 - 3:00pm
Prequalification: 

PSU Prequalification for Asbestos Abatement is required.

Clayo prequalification: Bidders can prequalify through First,Verify at firstverify.com.  Qualification through First,Verify is not a requirement to submit a bid, but is a requirement to work on the project.  Contact Clayco with any questions.

Professional Consultant
Company Name: 
DLA+
Contact Name: 
John Nolan
Address: 

Foster Plaza 9, Suite 200, 750 Holiday Drive, Pittsburgh, PA 15220

Phone: 
(412) 921-4300
CM Firm
Company Name: 
Clayco, Inc.
Contact Name: 
Michael Stauss
Address: 

2199 Innerbelt Business Center Drive, St. Louis, MO 63114

Phone: 
(314) 614-7191
Previous Bid Packages
Package Number Title Anticipated Document Delivery Pre-Bid Date/Time Pre-Bid Meeting Bid Date/Time Awarded To Document
37 Final Cleaning 12/20/2018 No pre-bid 01/15/2019 3:00 PM Snelick Construction Services
38 Signage 12/20/2018 No pre-bid 01/15/2019 3:00 PM The Orion Group
24 Paint (Rebid) 11/13/2017 11/16/2017 3:00 PM Voluntary 08/14/2018 3:00 PM Brumbaugh - Rail City Painting. Tener - Trihanson Development. Pinchot - Saint's Painting.
14 Masonry (Re-bid) 03/28/2018 11/16/2017 3:00 PM Voluntary 04/05/2018 3:00 PM Smith Masonry / St. Johns Masonry
21 Fireproofing (Re-bid) 11/13/2017 11/16/2017 3:00 PM Voluntary 02/01/2018 3:00 PM Atlantic Fireproofing
36 Roller Shades (Re-bid) 11/13/2017 11/16/2017 3:00 PM Voluntary 02/01/2018 3:00 PM Ralph Freidland
32 Abatement 12/18/2017 12/20/2017 1:00 PM Mandatory 01/04/2018 3:00 PM Plymouth
09 Earthwork and Site Utilities 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM Ameron Construction
12 Concrete 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM Ameron Construction, Site Concrete. JC Orr, Interior Concrete.
13 Steel 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM Altoona Pipe and Steel / RNR Construction
15 Glass & Glazing 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM Nittany Building Specialties
16 Drywall / Carpentry 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM JC Orr
17 Finish Carpentry 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM Fineline Cabinets
18 Waterproofing 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM
20 Roofing 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM Marcon
22 Doors / Frames / Hardware 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM HC Hood Co.
23 Flooring 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM Degol Carpet
25 Asphalt 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM Ameron Construction
26 Landscaping 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM Scott's Landscaping
27 Specilaities 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM
28 Residential Equipment 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM
31 Demolition 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM ISI Demo
34 Sound Isolation Rooms 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM Wegner
35 Fire Curtain 11/13/2017 11/16/2017 3:00 PM Voluntary 12/05/2017 3:00 PM
01 Mechanical 09/08/2017 No pre-bid 10/05/2017 3:00 PM Myco Mechanical
02 Electrical 09/28/2017 No pre-bid 10/05/2017 3:00 PM Howard / Stelco
03 Plumbing 09/28/2017 No pre-bid 10/05/2017 3:00 PM Myco Mechanical
04 Fire Protection 09/08/2017 No pre-bid 10/05/2017 3:00 PM S.A. Comunale