YK-Student/Comm. Ctr-Boiler Replacement

Project Number: 
00-09476.00
DGS Number: 
800-311
Project Status: 
Trade/Bid Packages
Campus: 
Project Stage: 
Out to Bid
Project Description: 

Replace the two existing natural gas boilers in the mechanical room of the Student Community Center at Penn State York with two new natural gas boilers that will tie into the existing piping system. One of the boilers must be kept operational throughout the project for dehumidification in the building. There are two bid packages. This is the HVAC package. The other bid package is the electrical package.

PSU Project Leader: 
Document Cost: 
$0.00
Bid Date and Time: 
Thursday, April 25, 2024 - 3:00pm
Prequalification: 

Penn State prequalified as a mechanical and HVAC contractor.

Additional Information: 

Bids will be received electronically only through the e-Builder Bid Portal. Bids in any other format will not be accepted.

Professional Consultant
Company Name: 
Barton Associates, Inc.
Contact Name: 
Bob Sells
Phone: 
(717) 817-2285
Document Distribution
Anticipated Document Delivery: 
Friday, April 5, 2024
Company Name: 
Electronic download via e-Builder
Previous Bid Packages
Package Number Title Anticipated Document Delivery Pre-Bid Date/Time Pre-Bid Meeting Bid Date/Time Awarded To Document
01 HVAC 04/05/2024 04/11/2024 10:00 AM Recommended but not Mandatory 04/25/2024 3:00 PM
02 Electrical 04/05/2024 04/11/2024 10:00 AM Recommended but not Mandatory 04/25/2024 3:00 PM