AB-New Academic Building

Project Number: 
00-06256.00
Project Status: 
Trade/Bid Packages
Campus: 
Project Stage: 
Out to Bid
Project Description: 

A new Academic Building at the Penn State Abington campus. The project is a three-story building with a mechanical penthouse located at the western edge of campus off Cloverly Lane. The building program consists of general-purpose classrooms, art classrooms, offices, conference rooms, and general building support. Two existing buildings on site will be demolished, and new utilities will be required at the site location to connect to the existing campus infrastructure.

PSU Project Leader: 
Document Cost: 
$0.00
Bid Date and Time: 
Tuesday, April 30, 2024 - 3:00pm
Prequalification: 

L.F. Driscoll requires all trades to undergo our prequalification process. Contact the prequalification manager, Karen Noel, to send prequal-related information. Mobile: (215) 518-4199 Email: knoel@lfdriscoll.com.

Penn State requires the following trades also to be prequalified through the university:

  • Access Control and Surveillance
  • Asbestos Abatement
  • Demolition/Hauling
  • Telecommunications
  • Electrical (Med/High Voltage)

If you are on the trades list above, Contact Sarah Carey at Sarah.Carey@LFDriscoll.com to start the prequalification process with Penn State.

Additional Information: 

Bids submitted Building Connected. All bid/contract documents will also be issued through Building Connected. If access to Building Connected is needed, email Sarah Carey at Sarah.Carey@LFDriscoll.com.

Professional Consultant
Company Name: 
KCBA Architects
Contact Name: 
Stacy L. Thomas
Phone: 
(215) 368-5806 x106
CM Firm
Company Name: 
L. F. Driscoll Co.
Contact Name: 
Sarah Carey
Phone: 
(610) 721-3106
Document Distribution
Anticipated Document Delivery: 
Tuesday, April 2, 2024
Company Name: 
Electronically through Building Connected
Contact Name: 
Sarah Carey
Previous Bid Packages
Package Number Title Anticipated Document Delivery Pre-Bid Date/Time Pre-Bid Meeting Bid Date/Time Awarded To Document
01 Asbestos/Hazardous Material Abatement 04/02/2024 04/16/2024 10:00 AM Mandatory 04/30/2024 3:00 PM
02 Building Demolition 04/02/2024 04/16/2024 10:00 AM Mandatory 04/30/2024 3:00 PM
03 Sitework / Utilities 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
04 Sitework / Utilities - Site Concrete Carve out Package 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
05 Sitework / Utilities - Asphalt Paving Carve out Package 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
06 Sitework / Utilities - Signage & Striping Carve out Package 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
07 Fencing & Gates 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
08 Landscaping 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
09 Cast-In-Place Concrete 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
10 Cast-In-Place Concrete - De-attached Mechanical Yard Carve out Package 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
11 GFRC Exterior Panels 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
12 Masonry & Stone 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
13 Structural Steel, Metal Deck & Joists 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
14 Miscellaneous Metal Fabrications 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
15 Millwork & Finish Carpentry 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
16 Waterproofing 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
17 Roofing 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
18 Doors, Frames, & Hardware 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
19 Loading Dock Equipment 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
20 Metal Panels 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
21 Exterior Glazing 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
22 Interior Glazing 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
23 Drywall, Rough Carpentry, & Act 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
24 Drywall, Rough Carpentry, & Act - ACT Carve out Package 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
25 Tile 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
26 Terrazzo 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
27 Polished Concrete 04/02/2024 04/02/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
28 Flooring 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
29 Flooring - 1st Floor 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
30 Flooring - 2nd Floor Carve out Package 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
31 Flooring - 3rd Floor Carve out Package 04/02/2024 04/02/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
32 Painting and Special Coatings 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
33 Wall Coverings 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
34 Specialties 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
35 Window Treatments 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
36 Signage 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
37 Elevators 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
38 Fire Protection 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
39 Mechanical / Plumbing 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
40 Site Electric - Medium Voltage Utility and Site Lighting/Misc. Power 04/02/2024 04/16/2024 10:15 AM Recommended but not Mandatory 04/30/2024 3:00 PM
41 Electrical 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
42 Fire Alarm 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
43 Security 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM
44 IT - Telecom, ERRCS & DAS 04/02/2024 04/16/2024 10:00 AM Recommended but not Mandatory 04/30/2024 3:00 PM