Holuba Hall Lighting Upgrade Phase 1
Install nLight Air wireless control systems equipment and coordinate with nLight controls teams and PSU for final programming functions and desired zonings; Disconnect and remove existing 2’x8’ T5-HO fluorescent light fixtures; Install the GC provided 2’x4’ LED fixtures with integral wireless controls, being mindful of the new locations of Normal/Emergency fixtures; All installed light fixtures must be ready to be used the morning following their installation to allow for minimal interruptions to the day-to-day operations of the facility; Emergency only circuiting within the building to be updated to an N/E type system by re-feeding an existing Emergency Only panel from the current N/E panel; Re-circuiting at the ceiling level for Normal and Normal/Emergency fixtures to be coordinated with loading, locations, and circuit availability as shown on plans; Final functionality and life safety testings of system with PSU and nLight controls teams on-site.
All bids will be submitted via BuildingConnected.