Capital Systems Renewal Program
The University has embarked on a comprehensive Capital Systems Renewal initiative, partially funded through DGS. Priority has been given to the following building systems:
• Facade
• Roof systems
• Windows
• Elevators
• Electrical systems
Each system is internally stewarded by Asset Management Teams consisting of representatives from Work Control, Project Management, Design Services, Engineering Services, Area Services, Planning, Design and Properties, and others. Each Asset Management Team has compiled a portfolio of projects that have been, or are in the process of being, prioritized in order of need.
It is the intention of this Capital Renewal Program to compile these priorities and execute the scopes of work in a logical manner that optimizes the available funding and minimizes disturbance of occupants and campus operations. It is the desire of the University to secure the services of a construction manager to assist in the efforts to coordinate this campus-wide effort alongside the designated Project Management team from programming through construction.
Attachment | Size |
---|---|
![]() | 191.37 KB |