Lasch Building Renovations

Project Number: 
00-06882.00
Project Description: 

The project is an addition and renovation to the Lasch Football building, occurring in multiple phases.  Phase 1 of the project will include a back entrance and lobby addition, weight room expansion, and a renovation of the existing sports medicine area inclusive of demolition, new enclosure, foundations, structure, MEP systems, graphics and interior finishes.

Bid Date and Time: 
Wednesday, January 6, 2021 - 3:00pm
Prequalification: 

Prequalification information is in section 13 of the Request for Proposal. Prequalification is NOT required to bid, only proposal finalists need to complete online prequalification. Finalists will receive a prequalification invite from Mortenson/TradeTapp.

Additional Information: 

Virtual Pre-bid meeting via Microsoft Teams. Information about access can be obtained through BuildingConnected.  If you do not have access to BuildingConnected, please send an email to Ryan.McCrary@mortenson.com

Proposal Documents may be obtained through BuildingConnected, an online service for storing and sharing bid documents for the construction industry. If you do not have access to BuildingConnected, please send an email to Ryan.McCrary@mortenson.com and he will forward you the link a link to access to the bidding documents.

All bids are due electronically via BuildingConnected.com  See table below for bid date and time.

Professional Consultant
Company Name: 
HOK
Contact Name: 
Todd Carll
Address: 

One Logan Square, Suite 1510, Philadelphia, PA

Phone: 
(215) 940-3836
CM Firm
Company Name: 
Mortenson
Contact Name: 
Ryan McCrary
Address: 

Behind the Lasch Building, 1 McKean Road, University Park, PA 1

Phone: 
(763) 287-5755
Previous Bid Packages
Package Number Title Anticipated Document Delivery Pre-Bid Date/Time Pre-Bid Meeting Bid Date/Time Awarded To Document
1.03 Structural Steel Demo/Disassembly (Re-bid) 11/13/2020 11/03/2020 9:00 AM Voluntary 01/06/2021 3:00 PM Amthor
1.08 Structural Steel (Re-bid) 11/13/2020 11/03/2020 9:00 AM Voluntary 01/06/2021 3:00 PM Amthor
1.20 Miscellaneous Metals, Railings, Stairs & Seismic Top of Wall Clips (Re-bid) 11/13/2020 11/03/2020 9:00 AM Voluntary 01/06/2021 3:00 PM
1.02 Site Utilities & Earthwork 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Glenn O. Hawbaker, Inc.
1.04 Selective Demolition 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM J.C. Orr and Son, Inc.
1.05 Deep Foundations 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Michels
1.07 Structural Concrete 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM J.C. Orr and Son, Inc.
1.09 Mechanical & Plumbing 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM G.R. Sponaugle
1.10 Fire Protection 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM S.A. Comunale
1.11 Electrical, Fire Alarm, Security & Data 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Schultheis Electric
1.15 Masonry 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Smith Masonry
1.16 Metal Panels 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Nittany Building Specilaties
1.17 Exterior Glazing 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Nittany Building Specilaties
1.18 Roofing 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM RH Marcon
1.21b Drywall, Rough Carpentry, Acoustical Ceilings 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM J.C. Orr and Son, Inc.
1.22 Fireproofing 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Novingers
1.23 Interior Glazing 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Nittany Building Specilaties
1.24b Millwork 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Rycon
1.24d Doors, Frames & Hardware 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM HC Hoodco
1.24e Specilaties & Accessories 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Penn Installations
1.24k Audio Visual Equipment 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Guyette
1.24m Demountable Partitions 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Transwall
1.25 Athletic Lockers 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Hollman
1.26 Overhead Doors 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Central PA Dock & Door
1.27 Resilient & Carpet Flooring 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM DeGol Carpet & Ceramic Tile
1.28 Tile 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Penn Installations
1.30 Fluid Applied Flooring 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM
1.32 Painting & Intumescent Paint 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM
1.39 Fencing & Gates 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Nastase
1.41 Site Concrete, Hardscape, Asphalt & Paving 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Glenn O. Hawbaker, Inc.
1.42 Landscape 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Scott's Landscaping
1.43 Graphics & Signage 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Dimensional Innovations
1.44 Window Shades 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Easley & Rivers
1.46 Artificial Turf & Rubber Athletic Flooring 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM Abacus
1.48 Final Cleaning 11/13/2020 11/03/2020 9:00 AM Voluntary 12/08/2020 3:00 PM National Construction Cleaners
1.13 Elevator Remove & Reinstall (RFP 3) 08/31/2020 09/02/2020 8:30 AM Voluntary 09/22/2020 3:00 PM Port Elevator
1.21 Exterior Fabrication (RFP 2) 08/06/2020 08/10/2020 9:00 AM Voluntary 08/25/2020 3:00 PM BLUVera
1.49 FRP (RFP 2) 08/06/2020 08/10/2020 9:00 AM Voluntary 08/25/2020 3:00 PM Pullman SST, Inc.
1.50 FRP Demolition, Enabling & Restoration (RFP 2) 08/06/2020 08/10/2020 9:00 AM Voluntary 08/25/2020 3:00 PM J.C. Orr and Son, Inc.
1.14 Hydrotherapy Pools 07/10/2020 No pre-bid 07/21/2020 3:00 PM Hydroworx
1.02 Site Utilities 03/03/2020 03/06/2020 8:00 AM Recommended but not Mandatory 03/17/2020 3:00 PM RC Bowman
1.11 Electrical 03/03/2020 03/06/2020 8:00 AM Recommended but not Mandatory 03/17/2020 3:00 PM Schultheis
1.39 Fencing 03/03/2020 03/06/2020 8:00 AM Recommended but not Mandatory 03/17/2020 3:00 PM Nastase
1.42 Landscape 03/03/2020 03/06/2020 8:00 AM Recommended but not Mandatory 03/17/2020 3:00 PM Green Valley