Walker Building HVAC Upgrades
Abatement and demolition of portions of mechanical and electrical systems in the existing mechanical room and Ground/First Floors of the Walker Building over the summer months of 2020. This work will include the abatement and replacement of mechanical piping, the majority of lights/ceilings, and some architectural patching work.
Proposers must be prequalified with Barton Malow Company before receipt of proposals. Use the link below to start Barton Malow's Prequalification process:
https://www.bartonmalow.com/subcontractors
The project will be bid through BuildingConnected. Please contact Patrick Laninger at Barton Malow if interested in bidding for access to the project/bid documents on this web-based service. Email patrick.laninger@bartonmalow.com